亚洲熟妇精品一区二区在线播放|大地资源二在线观看免费高清小说|潮喷大喷水系列无码久久精品|亚洲色欲色欲www在线播放

常州精密鋼管博客網

鋼管生產過程介紹全書(英文版)【下載】

鋼管生產過程介紹全書(英文版)【下載】

Steel Tube and Pipe Manufacturing Processes

The advent of rolling mill technology and its development during the first half of the nineteenth century also heralded in the industrial manufacture of tube and pipe. Initially, rolled strips of sheet were formed into a circular cross section by funnel arrangements or rolls, and then butt or lap welded in the same heat (forge welding process). Toward the end of the century, various processes became available for the manufacture of seamless tube and pipe, with production volumes rapidly increasing over a relatively short period. In spite of the application of other welding processes, the ongoing development and further improvement of the seamless techniques led to welded tube being almost completely pushed out of the market, with the result that seamless tube and pipe dominated until the Second World War. During the subsequent period, the results of research into welding technology led to an upturn in the fortunes of the welded tube, with burgeoning development work ensuing and wide propagation of numerous tube welding processes. Currently, around two thirds of steel tube production in the world are accounted for by welding processes. Of this figure, however, about one quarter takes the form of so-called large-diameter line pipe in size ranges outside those which are economically viable in seamless tube and pipe manufacturing. 

Steel Tube and Pipe Manufacturing Processes-7.jpg

Chart I provides an overview of the size ranges for seamless (DIN 2448) and welded (DIN 2458) tube. As is evident, welded tube is predominantly manufactured in ranges characterized by small wall thicknesses and large outside diameters, while seamless tube is produced mainly in the range extending from normal to very large wall thicknesses in the diameter range up to approx. 660 mm. The process of selection of the manufacturing process – especially in the overlap regions where there is a real choice between seamless and welded tube – is essentially dictated by the application of the tube, i.e. the associated material requirements and the service conditions. 

Steel Tube and Pipe Manufacturing Processes-6.jpg

Chart II provides a summary of the main manufacturing processes applied nowadays in the production of seamless and welded steel tube. Also indicated are the upstream production stages, any downstream further processing operations, and the typical products of the individual technologies. This scheme has been applied in order to illustrate the fact that a varying number of production stages in the starting material preparation or roughing stage are required to serve the various facilities of the tube production stage. 

Steel Tube and Pipe Manufacturing Processes-5.jpg

In the case of seamless tube and also in the case of the Fretz-Moon welding process, the production stage invariably involves a heating operation, in which case the product may also be referred to as hotformed tube or pipe. Downstream facilities for hot drawing or hot expanding occur relatively rarely; on the other hand, hot-formed tubes are extensively used as starting products for a downstream cold forming process. The latter is used in order to extend the product mix of a plant toward smaller diameters and wall thicknesses (DIN 2391), to reduce wall thickness and diameter tolerances, and to achieve special surface finishes or mechanical/thermo-mechanical properties in the tube. 

Steel Tube and Pipe Manufacturing Processes-4.jpg

The production of welded tube initially involves the continuous forming of strip, sheet or plate in roll stands (sometimes referred to as roller cages), or in presses (U-ing and O-ing; C-ing process). The strip may also be cold-formed on a three-roll bending machine and subsequently welded by pressure or fusion welding to produce the finished tube. Depending on the forming process, a distinction is made between longitudinally welded and spiral-welded tube; the latter may also be referred to as helical seam pipe.- 

Steel Tube and Pipe Manufacturing Processes-3.jpg

As the requirements imposed on tubular products continued to increase, not only were the associated manufacturing processes constantly improved, but also appropriate systems for effective production control and quality assurance were introduced. Nowadays, tube and pipe manufacturers of renown all have a system in place enabling the production process from the steelworks to the finished tube to be continuously monitored and documented for total traceability, and effectively controlled on the basis of quality criteria. The mechanical and nondestructive tests stipulated in the relevant technical specifications are carried out by personnel operating independently from the production control department so as to guarantee product of a constantly high quality.

Steel Tube and Pipe Manufacturing Processes-2.jpg

目錄:

Steel Tube and Pipe Manufacturing Processes-1.jpg

這本書主要供給做鋼管外貿的朋友們,是用來和老外吹牛的百科全書。


全書下載網址鋼管生產過程介紹全書(英文版)【下載】


圖片加載中...
? 請關注 微信公眾號: steeltuber.
 轉載請保留鏈接: http://jmdakun.com/Download/Steel-Tube-Pipe-Manufacturing-Processes.html
(本平臺"常州精密鋼管博客網"的部分圖文來自網絡轉載,轉載目的在于傳遞更多技術信息。我們尊重原創(chuàng),版權歸原作者所有,若未能找到作者和出處望請諒解,敬請聯(lián)系主編微信號:steel_tube,進行刪除或付稿費,多謝!)
搜索本站鋼鐵技術
★↓在此搜索查找鋼鐵材料知識↓★↘

互聯(lián)網 jmdakun.com


鋼鐵行業(yè)熱點文章推薦

常州精密鋼管博客網主辦單位:
常州仁成金屬制品有限公司 是 專業(yè)的 精密鋼管 生產廠家,汽車鋼管,電機殼鋼管 生產單位。


常州精密鋼管博客網推薦您訪問:

常州精密鋼管博客網
(常州仁成金屬鋼管制品生產廠家博客網站)
jmdakun.com?2006-2021
蘇ICP備08003692號

【關于本站】【提問】網站地圖【搜索】【知識星球】電腦端

无码性午夜视频在线观看| 日韩~欧美一中文字幕| 成人av在线播放不卡| 久久久久久午夜成人影院| 久久久久亚洲精品| 久久国产精品老女人| 亚洲最大天堂无码精品区| 国产精品自在自线视频| 国产一区二区三区高清在线观看| 四虎永久在线精品免费网址| 少妇把腿扒开让我舔18| 国产成人无码av片在线观看不卡| 亚洲精品无码高潮喷水a片软| 国产亚洲精品成人aa片新蒲金| 国产成人av乱码在线观看| 看全黄大色黄大片美女| 强插女教师av在线| 久久精品人妻无码一区二区三区| 中文字幕日本乱码仑区在线| 欧美日韩精品一区二区在线观看| 国产日本亚洲一区二区| 国产丶欧美丶日本不卡视频 | 边做饭边被躁bd苍井空图片| 少女高清影视在线观看动漫| 日产精品久久久久久久| 欧美黑人激情性久久| 国产果冻豆传媒麻婆精东| 黑人大荫蒂老太大| 亚洲人ⅴsaⅴ国产精品| 久久久久国产综合av天堂| 国产精品久线在线观看| 少妇又爽又刺激在线直播| 欧美人与动性xxxxbbbb| 久久久久99精品成人片欧美| 欧美一区二区三区久久综合| 国产成人免费高清激情视频 | 精品国产av一区二区三区| 无码人妻一区二区三区线 | 久久综合久久鬼色| 色综合久久综合欧美综合网| 日日碰狠狠添天天爽超碰97久久|